CareerPlanGet AI match score →

Assistant Project Manager or Senior Coordinator (Facade, Construction)

Site Office @ Shears Avenue💼 Full-time🗓 2026-05-06 → 2026-07-31

Core

Coordinate facade works documentation, track design changes, and monitor site progress for a large-scale construction project including a 15,000-seat arena and luxury hotel tower.

Role type

Assistant Project Manager (Construction/Facade)

Builds

A state-of-the-art 15,000-seat arena, an all-suite luxury hotel tower, and MICE space for Marina Bay Sands Integrated Resort 2.

Domain

Construction, Facade Engineering, Large-scale Infrastructure

Deliverable

production ML models | product features | dashboards & analysis | research | client delivery | infrastructure | physical/clinical work

Required skills

Facade works knowledge, construction project management, shop drawing review, RFI management, method statement review, QA/Safety plan tracking, risk identification, progress reporting, non-conformance report closure, BIM process understanding, Aconex/Sharepoint proficiency

Preferred skills

BSc in Building/Construction Management, experience with local authority codes (BCA, URA, LTA, PUB, NEA)

Responsibilities

Collate and maintain tracking schedules for facade submissions; coordinate team interfaces for documentation; track design changes internally and externally; assist in identifying early warnings and risks; prepare progress meeting minutes and project reports; monitor site progress against the Master Construction Programme; monitor and close out non-conformance reports; monitor construction activities for safety violations.

Seniority

Mid-level, hands-on IC

Sourced via workday · Listed on CareerPlan, which tracks 70,000+ jobs from 20+ sources.
Apply on Workday ↗