Quality Assurance PM – Electrical - Data Center Construction
Core
Oversee electrical construction activities for data center projects, ensuring schedule adherence, quality compliance, and coordination between stakeholders and contractors.
Role type
Senior IC electrical project manager (construction)
Builds
Mission-critical electrical systems (substations, transformers, power distribution) for data centers
Domain
Construction / Data Center Infrastructure
Required skills
Electrical engineering, construction management, project governance, schedule tracking, stakeholder management, cost control, value engineering, risk mitigation, commissioning oversight, code compliance
Preferred skills
Substation and power distribution systems, MEP design, data center commissioning process (levels 1–5), construction document management (BODs, specs, drawings, RFIs)
Technologies
Procore, P6, CxAlloy, Excel, Word, PowerPoint, Outlook
Responsibilities
Manage electrical construction phases from preconstruction to L5 commissioning; monitor progress against GC schedule and report status to owner; review design submittals, drawings, and costs; provide technical support on electrical systems; ensure compliance with codes and safety standards; manage supplier interfaces and method of procedure (MOP) execution; identify risks and mitigation strategies; assist in closeout of construction issues.
Seniority
Senior, hands-on IC