Applied Physicist – ATLAS Muon LS3 Integration and Installation Manager (EP-ATL-AM-2026-198-LD)
Core
Managing the preparation and execution of installation, integration, and maintenance activities for the ATLAS Muon detector during CERN's Long Shutdown 3 (LS3).
Role type
Senior IC Applied Physicist (Project Management)
Builds
Upgrades and maintenance of the ATLAS Muon detector systems in the UX15 cavern
Domain
High-energy physics / Large-scale scientific instrumentation
Deliverable
physical/clinical work
Required skills
Coordination of large-scale detector systems, Planning and scheduling of multidisciplinary projects, Risk identification and management, Interface issue resolution, Safety systems management, Technical documentation
Preferred skills
Installation and integration of detector systems, Gas-based particle detection technologies, Commissioning of accelerator components
Technologies
Gas-based particle detectors, Accelerator beam line components, Underground installation infrastructure
Responsibilities
Coordinate installation and integration activities across Muon sub-projects, Act as liaison between Muon projects and ATLAS Technical Coordination, Develop and monitor the integrated LS3 schedule, Oversee technical activities in the UX15 cavern, Organize coordination meetings and maintain activity overviews, Prepare comprehensive progress reports and documentation
Seniority
Senior, hands-on IC