CareerPlanSign in

Final Assembly Lead Hand

Surrey💼 Full-time🗓 2026-08-13 → 2026-09-26

Core

Lead final assembly of large industrial battery energy storage systems, including structural assembly, high-voltage power routing, and End-of-Line testing.

Role type

Senior IC industrial assembly lead hand

Builds

Large-format battery energy storage systems (BESS) for independent energy deployment

Domain

Renewable energy / Battery storage manufacturing

Deliverable

production ML models | product features | dashboards & analysis | research | client delivery | infrastructure | physical/clinical work

Required skills

heavy industrial machine building, industrial switchgear assembly, complex mechanical and electrical system integration, electrical testing (Megger, continuity, hi-pot), interpreting engineering drawings, manufacturing drawings, quality standards, CSA C22.1 code compliance

Preferred skills

lithium-ion battery systems, BESS, electric vehicle technologies, new product introduction (NPI), manufacturing process development

Technologies

overhead cranes, gantry systems, forklifts, industrial disconnects, transformers, breakers

Responsibilities

Lead final assembly of complete battery energy storage systems, safely operate material handling equipment, ensure precise mechanical alignment and torque values, install and wire sub-panels and high-capacity electrical interfaces, perform End-of-Line and Factory Acceptance Testing, diagnose and resolve complex mechanical and electrical issues, mentor technicians and apprentices, complete build travelers and final inspection documentation

Seniority

Senior, hands-on IC

Sourced via greenhouse · Listed on CareerPlan, which tracks 70,000+ jobs from 20+ sources.