CareerPlanSign in

Site Engineer - Electrical (Substations)

Sydney, New South Wales💼 Full-time🗓 2026-09-17 → 2026-09-26

Core

Design, build, finance, operate, and maintain a 90km 500kV and 150km 330kV transmission network connecting wind and solar projects in the Central-West Orana Renewable Energy Zone.

Role type

Site Engineer – Electrical (Substations)

Builds

500kV overhead transmission lines and 330kV transmission lines for generator connections

Domain

Renewable energy infrastructure / High voltage transmission

Deliverable

production ML models | product features | dashboards & analysis | research | client delivery | infrastructure | physical/clinical work

Required skills

Electrical engineering, construction management, HS&E compliance, regulatory knowledge, resource planning, subcontractor coordination, cost planning, schedule monitoring

Preferred skills

Substation project experience

Technologies

500kV systems, 330kV systems

Responsibilities

Maintain quality and environmental standards, record non-conformances and drive corrective actions, prepare Inspection Test Reports, plan materials and construction methods, monitor progress and coordinate activities, ensure contract requirements at crew level, coordinate resources and track subcontractor performance

Seniority

Mid-level, hands-on IC

Sourced via viewjobs · Listed on CareerPlan, which tracks 70,000+ jobs from 20+ sources.