CareerPlan

Thesis Work on Impact of Process-Heat Electrification on the Internal Electrical Infrastructure of an F&B Plant

Vaesteras, Vastmanland County, SwedenFull-time2026-10-07 → 2026-11-10
Based in Sweden

Core

Model the impact of replacing fossil-fired steam boilers with electric boilers or heat pumps on the internal electrical distribution system of a food and beverage facility.

Role type

Research student (Thesis Work)

Builds

Plant-level electrical and process models

Domain

Energy Engineering / Power Systems

Deliverable

research

Required skills

Python, MATLAB, power-system analysis tools (Pandapower, PowerFactory), electrical engineering, power systems, energy engineering

Responsibilities

Develop plant-level electrical and process models, Quantify impacts on voltage, loading and power quality, Assess mitigation value of process flexibility and storage