Vessel Scheduler
Core
Owns the detailed production schedule for assigned hulls, maintaining activity logic, sequencing, and milestones in Primavera P6 to support the integrated master schedule.
Role type
Senior project controls scheduler (shipbuilding)
Builds
Detailed hull-level production schedules and milestone forecasts
Domain
Shipbuilding / Marine construction
Required skills
Primavera P6, Critical Path Method (CPM), Schedule Performance Metrics (SV, SPI), WBS management, Look-ahead scheduling, Risk analysis, Microsoft Excel
Preferred skills
New construction vessel scheduling, Marine construction sequencing, PMI-SP, AACE PSP
Technologies
Primavera P6, Microsoft Office
Responsibilities
Develop and maintain detailed Primavera P6 schedules with activity logic and sequencing; Verify WBS, estimates, and sequence logic for constructibility; Update schedule progress and maintain near-term priorities; Integrate quality hold points (RFI, FAT, punch lists) into the schedule; Perform critical path analysis to identify risks and recovery opportunities; Calculate schedule variance and SPI against baseline; Produce milestone bar charts, S-curves, and look-ahead schedules; Coordinate with engineering and procurement to align design releases and material availability.
Seniority
Mid-level, hands-on IC