CareerPlan

Integration Manager- Data Centre Construction

Milan, Europe, itFull-time2026-10-27 → 2026-11-10
On-site

Core

Lead integration and technical infrastructure delivery for data centre construction projects, coordinating internal and external teams from design through close-out.

Role type

Senior IC Integration Manager (Data Centre Construction)

Builds

Data centre physical and technical infrastructure

Domain

Construction / Data Centre Infrastructure

Required skills

Multi-disciplinary design coordination, stakeholder management, procurement strategy, constructability analysis, scheduling, risk management, quality and safety oversight, change management, documentation management, on-site representation

Preferred skills

Data centre infrastructure knowledge (servers, storage, networking, power, cooling), multi-vendor environment management

Technologies

Corporate wired/wireless networking, FF&E, AV systems, RoIP, Telecoms infrastructure

Responsibilities

Lead integration activities through Design, Construction, and Close-Out phases; Attend and contribute to multi-disciplinary design and construction workgroups; Run key meetings and provide progress reports; Ensure flow of information between all parties; Provide constructability, scheduling, phasing, and risk input; Manage telecoms and integration procurement strategies; Oversee quality, safety, change management, and inspections; Produce and manage Integration Requirements Documents and handover documentation; Drive stakeholder alignment across Corpnet, WAN, Fabric, Core, Security, and Operations; Act as the full-time on-site client representative.

Seniority

Senior, hands-on IC