CareerPlan

Optimisation de la Performance Industrielle et des Flux de Production (H/F) - Stage

Faverges-Seythenex, frFull-time2026-10-20 → 2026-11-10

Core

Optimizing textile manufacturing workshop performance by identifying bottlenecks and improving line efficiency metrics.

Role type

Industrial engineering intern (production optimization)

Builds

Daily, weekly, and monthly analysis tools for Overall Equipment Effectiveness (TRS) and throughput time reduction solutions.

Domain

Textile manufacturing / Industrial engineering

Required skills

Value Stream Mapping (VSM), Overall Equipment Effectiveness (TRS) analysis, data analysis, problem-solving, industrial vision knowledge, Office suite proficiency

Preferred skills

Industrial vision, data analysis

Responsibilities

Identify production bottlenecks using VSM, develop analysis tools for line performance, define solutions to reduce throughput times

Seniority

Intern (final year engineering student)