Scheduler - Data Center Construction
Core
Construction Scheduler responsible for updating and maintaining construction schedules, coordinating schedule inputs, and delivering project status reports for data center construction projects.
Role type
Senior Construction Scheduler (Project Control)
Builds
Integrated enterprise-based cross-functional and EPC master schedule programs for construction projects
Domain
Construction / Infrastructure / Data Centers
Required skills
Primavera P6, Critical Path Analysis, Probabilistic Analysis, Schedule Baselining, Risk Analysis, Master Schedule Development, Performance Reporting
Preferred skills
SOX control experience, Engineering background
Technologies
Primavera P6
Responsibilities
Coordinate and organize multiple sources of schedule inputs/performance data into a master schedule platform; Implement project planning & scheduling strategy; Perform critical path analysis; Perform probabilistic analysis on integrated schedules; Prepare staffing, engineering, and construction progress reports.
Seniority
Mid-Senior, hands-on IC