CareerPlanSign in
This role has closed. Browse similar live roles below, or see all open jobs →

Design Manager - Data Center Construction Administration [Mechanical]

USA wide, us💼 Full-time💰 $90,000–$90,000🗓 2026-09-23 → 2026-09-25

Core

Leading and coordinating the mechanical design process for data center construction projects from inception through close-out, ensuring alignment with technical requirements and quality standards.

Role type

Senior Design Manager (Mechanical)

Builds

Construction documentation, design packages, as-built drawings, and commissioning plans for data centers.

Domain

Commercial real estate / Data Center Construction / Mechanical Engineering

Deliverable

production ML models | product features | dashboards & analysis | research | client delivery | infrastructure | physical/clinical work

Required skills

Design management, BIM coordination, risk analysis, value improvement practices, submittal review, RFI management, site inspection, commissioning coordination, stakeholder liaison, quality assurance, construction management tools proficiency.

Preferred skills

Knowledge of design standards and building codes, familiarity with permitting processes, leadership in conflict resolution.

Technologies

Bluebeam, Procore, SharePoint, Microsoft Teams, BIM tools.

Responsibilities

Lead design process and coordinate with Engineer of Record; Develop and maintain Design Management Plan; Review submittals and coordinate approvals; Manage RFIs and design changes; Conduct site inspections and witness testing; Coordinate as-built drawings issuance; Support commissioning agent and close-out activities.

Seniority

Senior, hands-on IC

Sourced via smartrecruiters · Listed on CareerPlan, which tracks 70,000+ jobs from 20+ sources.