CareerPlanSign in

Design Manager - Data Center Construction Administration [Electrical]

USA wide, us💼 Full-time💰 $90,000–$90,000🗓 2026-09-23 → 2026-09-25

Core

Leading and coordinating the design process for mechanical systems in data center construction projects from inception through close-out.

Role type

Senior Design Manager (Mechanical)

Builds

Construction documentation, design packages, as-built drawings, and commissioning plans for data centers.

Domain

Commercial real estate / Data Center Construction / Mechanical Engineering

Deliverable

production ML models | product features | dashboards & analysis | research | client delivery | infrastructure | physical/clinical work

Required skills

Design management, BIM coordination, risk analysis, value improvement practices, submittal review, RFI management, site inspection, commissioning coordination, quality control, stakeholder liaison

Preferred skills

Knowledge of building codes, construction management tools (Bluebeam, Procore, SharePoint, Teams), SOX compliance

Technologies

BIM tools, Bluebeam, Procore, SharePoint, Microsoft Teams

Responsibilities

Lead design process with Engineer of Record, organize design reviews and programming meetings, review submittals for compliance, manage RFIs and changes, conduct site inspections and witness testing, coordinate as-built drawings, support commissioning agent, track close-out deficiencies

Seniority

Senior, hands-on IC

Sourced via smartrecruiters · Listed on CareerPlan, which tracks 70,000+ jobs from 20+ sources.