CareerPlan

Senior Electrical Cost Estimator - Data Center Construction

San Francisco, California, usFull-time$100k2026-09-17 → 2026-11-11
On-site · United StatesNo visa sponsorship

Core

Lead the development of detailed electrical estimates for large-scale construction programs, providing cost guidance throughout design and construction.

Role type

Senior Electrical Cost Estimator

Builds

Detailed electrical cost estimates for power distribution, switchgear, generators, lighting, and low-voltage systems

Domain

Construction / Electrical Systems / Data Center & Large-Scale Infrastructure

Required skills

Electrical estimating, quantity takeoffs, labor/material/equipment pricing, bid analysis, value engineering, BIM interpretation, estimating software proficiency, cost risk assessment

Preferred skills

Mentoring junior estimators, leading estimating efforts

Technologies

Bluebeam, OST, Accubid, Trimble, ConEst

Responsibilities

Lead preparation of detailed electrical cost estimates; Perform and oversee electrical quantity takeoffs from drawings, specifications, and BIM models; Develop, validate, and manage labor, material, and equipment pricing; Review and analyze contractor and subcontractor bids; Support value engineering efforts; Mentor junior estimators

Seniority

Senior, hands-on IC with mentorship responsibilities