CareerPlanSign in

Hydromechanical Engineer (Hydropower & Pumped Storage Projects)

Panaura, Uttar Pradesh 231213, India, in💼 Full-time🗓 2026-08-03 → 2026-09-25

Core

Supervise installation, inspection, testing, and commissioning of hydro-mechanical equipment (gates, valves, penstocks, pressure shafts) for hydropower and pumped storage projects.

Role type

Senior site-based hydromechanical engineer

Builds

Hydropower and pumped storage infrastructure

Domain

Water, energy, civil infrastructure

Deliverable

physical/clinical work

Required skills

hydro-mechanical equipment inspection, penstock installation monitoring, embedded parts verification, welding review, painting monitoring, quality assurance, site issue resolution, contractor coordination

Responsibilities

Inspect gates and valves, Monitor penstock installation, Verify embedded parts, Witness testing, Review welding, Monitor painting, Prepare inspection reports, Coordinate contractor, Verify quality, Resolve site issues

Sourced via smartrecruiters · Listed on CareerPlan, which tracks 70,000+ jobs from 20+ sources.