CareerPlan

Senior Electrical Estimator - Data Center Construction

USA wide, usFull-time$130k2026-07-24 → 2026-11-10
On-site · United StatesNo visa sponsorship

Core

Lead detailed electrical cost estimating for hyperscale data center projects, covering power distribution, backup generation, and critical systems.

Role type

Senior Electrical Estimator (Data Center Construction)

Builds

Detailed electrical estimates and cost models for large-scale mission-critical facilities

Domain

Construction / Data Center Infrastructure / Electrical Engineering

Required skills

Electrical estimating, quantity takeoffs (drawings, specs, BIM), labor/material/equipment pricing modeling, historical cost data management, bid analysis, value engineering, risk management, code compliance knowledge

Preferred skills

Hyperscale data center experience, high-density system estimation, supply chain risk assessment

Technologies

Accubid, ConEst, McCormick, Bluebeam, BIM tools

Responsibilities

Lead preparation of detailed electrical cost estimates for power distribution, substations, UPS, generators, and switchgear; Perform and oversee comprehensive electrical quantity takeoffs from drawings, specifications, and BIM models; Develop and validate labor, material, and equipment pricing models; Review, analyze, and normalize electrical contractor and subcontractor bids; Lead and support value engineering and design optioneering efforts; Partner with engineering, procurement, and construction leaders to inform electrical system decisions; Identify and manage risks related to long-lead equipment, supply chain constraints, and labor availability; Account for regional cost variability across U.S. markets; Support estimating for large-scale power infrastructure including utility tie-ins; Contribute to standardized data center designs; Ensure estimates align with applicable codes, safety standards, and sustainability objectives; Prepare clear, defensible estimating deliverables and present findings to stakeholders; Participate in cost reviews, procurement discussions, and commercial strategy sessions; Support change management by assessing electrical scope changes; Provide estimating handover materials to construction teams; Offer mentorship and technical guidance to junior estimators

Seniority

Senior, hands-on IC with leadership responsibilities