Telecom Electrical Engineer – Data Center Construction Projects
Core
Design, review, and coordinate low-voltage telecom and network systems including structured cabling for data center construction projects.
Role type
Telecom Electrical Engineer (Data Center Construction)
Builds
Structured cabling and communications infrastructure for data centers
Domain
Data Center Construction / Low-Voltage Electrical Systems
Deliverable
product features
Required skills
Design and review of telecom/network systems, coordination of structured cabling installation, integration with electrical infrastructure, commissioning and testing
Preferred skills
Knowledge of data center environments
Technologies
Structured cabling, networking systems, low-voltage systems
Responsibilities
Design and review telecom and network systems, Coordinate installation of structured cabling and systems, Ensure integration with overall electrical infrastructure, Support commissioning and testing