NY Construction Scheduling Lead
Core
Lead schedule development, governance, and analysis for a complex semiconductor manufacturing construction project, integrating activities across base build, systems, and commissioning to ensure operational readiness.
Role type
Senior Construction Scheduler (Capital Projects)
Builds
High-tech semiconductor manufacturing facilities (Megafab)
Domain
Semiconductor manufacturing / Industrial Construction
Required skills
Primavera P6, Critical Path Method (CPM), Level 3/4 schedule development, schedule risk analysis, Time Impact Analysis (TIA), critical path analysis, schedule forecasting, delay analysis, contractor schedule review
Preferred skills
EPC/EPCM/Design-Build experience, large-scale semiconductor/manufacturing construction, commissioning/startup integration, AI tools for project reporting
Technologies
Primavera P6
Responsibilities
Develop and maintain coordinated mid-level and detailed construction schedules; Drive Facilities Readiness schedule integration; Lead contractor timetable assessments and evaluate schedule logic; Perform critical path, what-if, and Time Impact Analysis (TIA) assessments; Provide executive-level schedule reporting and recommendations
Seniority
Senior, hands-on IC