CareerPlan

Assisting Overhead Transmission Linesperson

Wagga Wagga & Riverina, New South WalesFull-time2026-10-15 → 2026-11-11
Hybrid

Core

Assistant Overhead Transmission Linesworker supporting stringing crews in constructing and upgrading 500kV high voltage electricity transmission lines and towers.

Role type

Assistant Overhead Transmission Linesworker (Stringing Crew)

Builds

New 500kV double circuit transmission lines and upgraded infrastructure for the HumeLink project.

Domain

Energy infrastructure / High voltage transmission

Deliverable

physical/clinical work

Required skills

Climbing transmission structures, Installing and maintaining conductors and aerial equipment, Installing and maintaining electrical supply equipment, Attending to electrical breakdowns and emergencies, Interpreting technical drawings and network line diagrams, Completing comprehensive risk assessments, Adhering to site health and safety policies

Preferred skills

Trade Certification (Cert III ESI – Transmission Overhead), UETDRTO016 certification

Technologies

None stated

Responsibilities

Climbing of transmission structures, Upgrade and construction of new and existing assets, Study and interpret technical drawings, Liaise with Network Operator Inspectors, Complete comprehensive risk assessments, Maintain work in progress plans, Installing and maintaining conductors and aerial equipment, Installing and maintaining electrical supply equipment, Attending to electrical breakdowns and emergencies

Seniority

Mid-level (5 years experience required)