CareerPlan

Production Planner/Master Scheduler 2

MY-LMM KM [2700] (3833)Full-time2026-08-17 → 2026-10-24
Hybrid

Core

Plans, schedules, coordinates, and monitors final approval of products through the complete production cycle, establishing production schedules, labor loading, and capacity requirements based on engineering plans.

Role type

Intermediate production planner / master scheduler

Builds

Production schedules, labor loading, and capacity requirements for high-volume manufacturing

Domain

Semiconductor manufacturing / Supply chain

Required skills

ERP systems, lean manufacturing principles, production planning, inventory management, capacity planning, material requirements planning

Preferred skills

SAP proficiency, Microsoft Office, analytical problem-solving, mentoring junior planners

Responsibilities

Establish production schedules and labor loading, coordinate production plans to ensure material availability, resolve labor and material shortages and backlogs, oversee master schedules for compliance with materials requirements

Seniority

Intermediate, hands-on IC